STOCK TITAN

Pirate Gold Provides Crippleback Drilling Update, Appoints New CFO and Releases Episode 8 of Treasure Hunters

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
management

Pirate Gold (OTCQB: SICNF) reports ongoing drilling at the Crippleback Lake target, with two rigs testing an argillic alteration envelope that now spans about 1,700m by 700m to vertical depths exceeding 400m. Vuggy silicification and widespread pyrite were logged; assays have been submitted to the laboratory. The company released Episode 8 of Treasure Hunters on April 2, 2026, and appointed Natalia Samartseva as CFO effective April 1, 2026. Qualified Person Greg Matheson, P.Geo., reviewed the technical information.

Loading...
Loading translation...

Positive

  • Alteration footprint ~1,700m by 700m to >400m depth
  • Widespread vuggy silica and pyrite intersected in both drill holes
  • Assays submitted to laboratory for analytical testing
  • Experienced CFO appointed effective April 1, 2026 (15+ years)

Negative

  • CFO transition as Eric Myung stepped down, creating short-term leadership change
  • No assay results yet, leaving mineral grades and economic potential unconfirmed
  • Two drills are actively targeting the argillic alteration envelope at Crippleback Lake, the alteration envelope thought to indicate high sulphidation epithermal system or porphyry style mineralization
  • Drill hole PGC-26-058, encountered vuggy silicified mineralization near the bedrock surface; indications of advanced argillic alteration and silicification and strong pyrite mineralization throughout
  • Drill hole PGC-26-064, encountered a broad zone of vuggy silicified mineralization from 120 to 300m depth showing advanced argillic style alteration
  • Episode 8 of Pirate Gold Treasure Hunters now airing: https://youtu.be/Nii-tDFo2cE

St. John's, Newfoundland and Labrador--(Newsfile Corp. - April 2, 2026) - Pirate Gold Corp. (TSXV: YARR) (OTCQB: SICNF) ("Pirate Gold" or the "Company"), is pleased to provide an update on drilling at the Crippleback Lake target zone ("Crippleback") within its district-scale Treasure Island Project in central Newfoundland, alongside the release of Episode 8 of The Pirate Gold Treasure Hunters series.

Crippleback: Drilling Into the System

Two drill holes are ongoing targeting the argillic alteration zone first encountered in 2024. One drill is operating on the north and one on the south side of the alteration anomaly. Below is a general summary of the drilled intervals and alteration sequences:

PGC-26-058 targeted the alteration system from the south side of Crippleback Lake; this hole intersected an interval of vuggy, silicified volcanic rock from 15 to 137m downhole containing disseminated pyrite and muscovite alteration; from 137 to 247m in highly altered quartz monzonite marked by chlorite and montmorillonite alteration with pyrite mineralization. This included a veined zone from 224.5 to 232.0m with locally massive to semi massive pyrite; 247 to 293m intersected a phengite dominated volcanic sequence with disseminated pyrite and locally chalcopyrite; 293 to 395m intersected a kaolinite dominated alteration in both volcanic and felsic intrusive rocks with pyrite mineralization including a veined zone from 343.0 to 349.5m containing semi-massive pyrite mineralization; 395 to 562m intersected a volcanic sequence with muscovite-phengite alteration and disseminated pyrite mineralization; 562 to 602m intersected highly silicified monzonite and volcanic sequence containing pyrite as stringers.

PGC-26-064 is targeting the alteration system from the north side of Crippleback Lake. This hole intersected quartz monzonite from 0 to 107m depth dominated by chlorite alteration and disseminated pyrite mineralization; from 107 to 197m depth intersected silicified and vuggy volcanic and intrusive sequences with pyrite as stringers and disseminations dominated by muscovite and kaolinite alteration; 197 to 215m intersected heavily clay altered volcanic rocks dominated by pyrophyllite with local vuggy segments and pyrite

mineralization; 215 to 295m contained heavily clay altered volcanic rock with vuggy textures dominated by muscovite and kaolinite alteration carrying pyrite as disseminations and stringers; 295 to 349m intersected volcanic sequence heavily altered with pyrophyllite, pyrite as disseminations; 349 to 422m intersected monzonite with phengite and montmorillonite alteration with pyrite as semi-massive stringers and disseminations.

Greg Matheson, VP Exploration, commented:

"Preliminary observations from drilling at Crippleback have shown the alteration envelope has an extensive footprint now exceeding 1,700m in length and 700m in width at to vertical depths exceeding 400m. The scale of alteration is impressive and more importantly, we are seeing mineral assemblages of advanced argillic alteration consistent with high sulphidation epithermal systems and/or copper porphyry deposits. The vuggy silica textures encountered in both holes with pyrite mineralization throughout both drill holes are certainly encouraging; assays are now being submitted to the laboratory for analysis. We expect to complete several more holes in this phase of the exploration campaign before shifting our focus to the orogenic potential at Crippleback."

Drill HoleEasting NorthingAzimuthDip Length (m)
PGC-26-0585624515398587345-65122
PGC-26-0645627235399556145-45422*

 

*Drilling ongoing

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6079/290989_59f89cfd949c4bf4_001.jpg

Fig. 1 - Crippleback Zone Drill Holes PGC-26-058 and PGC-26-064

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6079/290989_59f89cfd949c4bf4_001full.jpg

Pirate Gold Treasure Hunters Season 1 Episode 8 - Sounding the Deep

Episode 8 of Pirate Gold Treasure Hunters advances the 2026 exploration campaign at Crippleback, with multiple drills now active and targeting the system at depth. The episode features:

  • Second drill brought online at Crippleback, accelerating exploration across the target
  • Drilling on both sides of Crippleback Lake, testing large-scale geophysical anomalies
  • Broad zones of advanced argillic alteration and vuggy silicification intersected at depth, with disseminated sulfides
  • Three drills now turning across the project, including ongoing high-grade work at Moosehead
  • Continued refinement of the geological model as drilling tests a large-scale alteration footprint at depth

Cannot view this video? Visit:
https://www.youtube.com/watch?v=Nii-tDFo2cE

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6079/290989_59f89cfd949c4bf4_002.jpg

Fig. 2 - Crippleback Zone Location Map

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6079/290989_59f89cfd949c4bf4_002full.jpg

Pirate Gold Appoints Natalia Samartseva as Chief Financial Officer

The Company is pleased to announce the appointment of Natalia Samartseva as Chief Financial Officer ('CFO") and Corporate Secretary of the Company, effective April 1, 2026.

Ms. Samartseva is a Chartered Professional Accountant with significant experience in public company reporting, IFRS, internal controls and auditing. She brings over 15 years of experience across diverse financial leadership positions having previously served as Chief Financial Officer and Director of Financial Reporting of companies listed in Canada and the United States. She has also held a variety of public accounting practice positions, including senior audit manager, and consulting engagements focused on financial reporting and analysis for junior resource companies. During her career, Ms. Samartseva has overseen projects related to internal control improvements implementation, preparation of financial models, forecasts, business valuation models, transition from exploration to commercial production stage for mining companies and other complex accounting and tax issues.

Concurrent with this appointment, Eric Myung has stepped down as CFO. The Board of Directors and executive management team of the Company extend their gratitude to Mr. Myung for his valuable contributions during his tenure and his support ensuring a seamless transition.

Qualified Person

Greg Matheson, P.Geo., VP Exploration for Pirate Gold, a "Qualified Person" under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

About Pirate Gold Corp.

Pirate Gold Corp. is led by an experienced management team and is the dominant explorer along the Valentine Lake Fault Zone in Newfoundland, Canada's newest gold district. The
Company's primary focus is its 100% owned district-scale Treasure Island Gold Project, along with a portfolio of gold projects, including the district-scale Fleur de Lys Project.

For more information, please contact:

Denis Laviolette, Executive Chairman, CEO & Director
E: denis@pirategold.ca

Cathy Hume, VP Corporate Development & Director
T: 416-868-1079 x 251
E: cathy@chfir.com

Website: www.pirategold.ca

Twitter: @PirateGoldCorp
Facebook: @PirateGoldCorp
LinkedIn: @PirateGoldCorp

Acknowledgment

Pirate Gold acknowledges the financial support of the Junior Exploration Assistance Program, Department of Natural Resources, Government of Newfoundland and Labrador.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Investors are cautioned that trading in the securities of the Company should be considered

highly speculative. This news release contains "forward-looking statements" within the meaning of the applicable Canadian securities legislation that are based on expectations, estimates, assumptions, geological theories, and projections as at the date of this news release. The information in this news release about any information herein that is not a historical fact may be "forward-looking statements." Actual results may differ materially. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (which may, but not always, include phrases such as "anticipates", "plans", "scheduled", "believed" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) including statements regarding the Company's plans with respect to the Company's projects and the timing related thereto, the merits of the Company's projects, the Company's objectives, plans and strategies, and other matters are not statements of historical fact and may be forward-looking statements and are intended to identify forward-looking statements. Factors that may cause results to vary include delays in obtaining necessary approvals, changes in the market for the Company's securities, results of exploration, loss of title to properties, delays in obtaining permits or access to mineral properties, including as a result of adverse weather, fire or flood, changes to the Tax Act, rejection of expenditures as Qualifying Expenditures, and factors included in the documents filed from time to time with the Canadian securities regulatory authorities by Pirate Gold Corp. Pirate Gold Corp. will not update these forward-looking statements to reflect events or circumstances after the date hereof, except as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/290989

FAQ

What did Pirate Gold (SICNF) report about Crippleback Lake drilling on April 2, 2026?

Pirate Gold reported two drills testing an argillic alteration zone with vuggy silica and pyrite. According to the company, the alteration footprint now measures ~1,700m by 700m and extends beyond 400m vertically, with assays submitted to a laboratory for analysis.

How deep did drill hole PGC-26-064 reach at Crippleback according to Pirate Gold (SICNF)?

PGC-26-064 is reported to have reached approximately 422m depth, with drilling ongoing. According to the company, the hole intersected silicified volcanic and intrusive units, advanced clay alteration (pyrophyllite) and disseminated to semi-massive pyrite.

What mineral alteration did Pirate Gold (SICNF) observe in PGC-26-058 on April 2, 2026?

PGC-26-058 logged vuggy, silicified volcanic rocks near surface and extensive altered intrusive sequences with pyrite. According to the company, intervals include kaolinite, muscovite-phengite and locally semi-massive pyrite veining to depth.

When will Pirate Gold (SICNF) release assay results from Crippleback drilling?

The company has submitted samples to the laboratory but did not provide a specific timing for results. According to the company, assays are in process and will be reported once analytical data are received and validated.

What does the appointment of Natalia Samartseva as CFO mean for Pirate Gold (SICNF)?

Natalia Samartseva joins as CFO and corporate secretary effective April 1, 2026, bringing IFRS and public reporting experience. According to the company, she has over 15 years in financial leadership and accounting roles for public resource companies.

Where can investors watch Pirate Gold Treasure Hunters Episode 8 released April 2, 2026?

Episode 8 is available online and highlights expanded drilling at Crippleback and project updates. According to the company, the episode can be viewed via the company’s published video link on April 2, 2026.
PIRATE GOLD

OTC:SICNF

View SICNF Stock Overview

SICNF Rankings

SICNF Latest News

SICNF Stock Data

80.83M
262.79M
Gold
Basic Materials
Link
Canada
Toronto